Auto Draft

Extra-high Voltage Composite insulator Manufacturer

At 00:39 on April 1st, with the normal closure of the 500 kV Jiangling-Ercheng DC bipolar system, the State Grid Hunan Electric Power was opened for 15 days. The annual inter-provincial Jiangcheng DC line and the Echeng converter station were completely closed for annual maintenance jobs.