Auto Draft

Composite Insulator Supplier for State Grid

State Grid Tianjin Electric Power has a total of 25 infrastructure projects for the summer power grid this year. It is expected to be completed and put into operation before the end of June. After the 25 summer peak projects are put into full operation, the Tianjin power grid structure and operation mode arrangements can be optimized to relieve the heavy load pressure on the main grid and solve the “bottleneck” problem.